Brand Name: HS
Model Number: HS-DY10
Place of Origin: China
Product introduction
Stainless steel Commercial egg white and yolk separator produced by our company is composed of egg breaker and egg yolk separator. The egg breaker simulates the artificial breaking of eggs delivered to the egg breaking station, and then pulls the eggshell apart by a special knife blade, so that the egg liquid can flow out. The egg liquid can be transported to the separating device through the receiving liquid tray and the guiding trough, and the egg white and the egg yolk can be separated by the separating device, and the egg yolk can be separated into the corresponding containers.
The appearance of the equipment is made of 304 stainless steel for easy cleaning. The whole
structure is compact, covers a small area, the output is moderate, so as to ensure the freshness
of the egg, suitable for small and medium-sized food factories, pastry and other units to use.
Model | Capacity | Power | Material | Machine size | Machine weight |
HSD7000 | 3600-7000pcs/h | 300w | SUS304 stainless steel | 1750*1150*1050mm | 130kg |
Product working environment
Working environment: temperature +10 to +65 degrees below 90% relative humidity.
Storage environment: temperature -25 to +65 degrees below 90% relative humidity.
Product packaging and disassembly instructions
1. Preparation work
The equipment adopts steel strip-edged wooden boxes. Before disassembly, check the appearance
of the packages in place to see if they are complete. If defects are found in the packages, contact
the supplier in time and assist in handling transportation accidents.
Prepare the horn hammer, screwdriver and movable wrench before opening the box
2. Disassembly work
The steel band around the packing box is buckled up one by one with a horn hammer and a
screwdriver, so as to avoid damage to the steel band buckle as far as possible. Then the top cover
of the packing box is removed first, and the side plate is removed one by one. This process avoids
violent disassembly. After disassembly, the side and the top cover are completely preserved for
1-2 weeks, and can be located after the equipment is commissioned and put into use. Rational
packing box.
Then find the packing list, packing items in the corresponding list, and take them out one by one.
Installation position of the main frame caster is fixed on the tray by bolt, and the bottom bolt is
removed by movable wrench. In this process, the tray is prohibited to tilt, causing equipment to
slide and injure people. According to the conditions, the auxiliary equipment can be selected for
disassembly, and the corresponding protection measures must be taken.
Packaging & Shipping
Our Services
1.Help you choose the most suitable machine.
2.Do design for you according to your request.
3.Supply machine information explain and show video for you
4.Normally the service life of our machines can be 5-8 years.
5.We offer full set of easy-spoiled spare parts and tools for back up.
6.We can send our engineer abroad to training you how to operate the machine
7.We can provid service in 24hours on line
Company Information
We are a manufacture to export and import for Machinery from 1990 to today,and have more than 10agents office in Nigeria ,Vietnam, Mongolia, Russia, Tanzania, and so on and every month have more than 10continer export , and your satisfied is our best service , welcome join us .
FAQ
Frequently Asked Question
1.Q:Are you a factory or trading company?
A:Our factory founded in 1990 ,and our export and import department founded in 2006 .
2.Q:Where's your factory located? How can i visit there?
A:Our factory is located in Zhengzhou city,Henan province,China,about 2 hours by fly from Guangzhou. here have more stock and machine for your test , welcome to vist us!!
3.Q:What's quality of your machinery ?
A:Our machine is international standard ,every machine make be from spare parts,painting ,test ,adjust and packing department ,so all step is be carefull ,and we also can according to your requested to design to make it ,and here have the enginner can go abroad for installed for you .
4.Q:How does your factory do regarding quality control?
A:We have the person check the machine from beginning to end.Our factory has gained BV,Intertek,SGS authentication.
5.Q:What is your payment terms?
A:30%T/T in advance,70% before shipping .or IRREVOCABLE L/C.
6.Q:What is your lead time?
A:With 3-10days after receiving deposit or original L/C.