- Products Details
Quick Details
-
Brand Name: WINTECO
Model Number: MK-2
Place of Origin: CHINA
Packaging & Delivery
- Packaging Details: Carton
- Delivery Detail: 30days
Specifications
Product Description
Effect of mist fan
WINTECO mist fan is a good product for summer time especially in outdoor and open space like restaurants, bars, swimming pools, parties, resorts,patio, deck, textile, mines...when the water misting evaporates, it can take away the heat and cool down the temperature by 4-8 degrees depending on environmental conditions, which will make people feel much more comfortable even sit outdoor in hot summmer.it can also eliminate the dust in the air which will make the air fresher.
WINTECO centrifugal mist fan is very easy and convenient to operate and maintain, there is no problem about nozzle blocking because centrifugal mist fan use submerged water pump and applies centrifugal misting technology,there is no such problem even in dusty area.
Feature of WINTECO mist fan
WINTECO mist fan is with very big misting volume, we are confident to say that the misting volume of our mist fan is almost double than normal mist fan with same size in the market. we install very powerful motors and big water pumps, which combines with our well-designed misting unit makes our misting fan more powerful and better cooling effect.
Picture of the product
Application of the product
Company Information
Winteco Industrial Co., Limited is a professional manufacturer and exporter specializing in heat exchanger coils like condenser and evaporator, and also commercial and industrial electrical appliances like outdoor mist fan, fog machine and air curtain. We are dedicated to creating a comfortable environment for people all over the world with our products.
FAQ
Q1. What is the MOQ?
A1. The prices we offered is one 20GP for MOQ. We can also accept small order and samples if you really need. It needs extra charge.
Q2. What is the Trade Term?
A2. We accept FOB Ningbo, CIF,CNF, or EXW, as your requirement.
Q3. How long is our production leading time?
A3. Our lead time is 20-30 days after receiving your deposit, if there is public vacations, the production time may be longer, but we will inform you in advance for any possible delay.
Q4. What is the Payment term?
A4. The payment term is 30% deposit after confirming the PI, and 70% balance before shipping when we inform the exact loading date. For future cooperation we can also accept 70% balance after shipping against B/L copy.
Q5. What is your products warranty?
A5. We guarantee one year for our products, during the warrantee period, we will offer free spare parts to you in time if there is any damage for manufacturing defects. But we will still supply spare parts at cost price even beyond the warrantee.
Scale: 51 - 100 People
Country/Region: China (Mainland)/Asia
Established: