Brand Name: SANHENG
Model Number: SH-1020/2 SAE
Place of Origin: Zhejiang, China (Mainland)
8MFD Good Quality Capacitor Fan Capacitor Electric Fan Capacitor
Product Introduction
1)Product: Solenoid Valve
2)Model: SH-1020/2 SAE
3)Brand: SANHENG
This Solenoid Valve is an automatic control part used in liquid line, suction line and steam line of refrigeration system to control the refrigerant to pass or not, the valve is widely used in refrigeration compressor group, central air-conditioning, cold storage equipment and bus air-conditioning system.
Specifications:
Refrigerant |
R12,R22;R134a,R404,R407C,R410,R502 |
Media Temperature |
-30℃ ~+105℃ |
Service |
100,000 cycles |
Working Pressure |
3.0Mpa |
Solenoid Coil |
8W |
Model |
Operating Principles |
Port Size |
Connection Size |
Opening Pressure Differential (Bar) |
KV factor (m³/h) |
|||
SAE(in) |
ODF |
|||||||
in. |
mm |
Min. |
Max. |
|||||
SH-1020/2 SAE |
Direct Acting |
2.5 |
1/4” |
- |
- |
0 |
21 |
0.175 |
SH-1020/3 SAE |
3/8” |
- |
- |
0.23 |
||||
SH-1028/2 ODF |
- |
1/4” |
- |
0.15 |
||||
SH-1028/3 ODF |
- |
3/8” |
- |
0.23 |
||||
SH-1064/3 SAE |
Diaphragm Pilot Operated |
7.0 |
3/8” |
- |
- |
0.05 |
0.80 |
|
SH-1064/4 SAE |
1/2” |
- |
- |
|||||
SH-1068/3 ODF |
- |
3/8” |
- |
|||||
SH-1068/4 ODF |
- |
1/2” |
- |
|||||
SH-1070/4 SAE |
12.5 |
1/2” |
- |
- |
2.20 |
|||
SH-1070/5 SAE |
5/8” |
|
- |
2.61 |
||||
SH-1078/4 ODF |
- |
1/2” |
- |
2.20 |
||||
SH-1078/5 ODF |
- |
5/8” |
16 |
2.61 |
||||
SH-1078/6 ODF |
|
3/4” |
|
|||||
SH-1079/7 ODF |
|
7/8” |
22 |
|||||
SH-1098/6 ODF |
16.5 |
|
3/4” |
|
4.80 |
|||
SH-1098/7 ODF |
|
7/8” |
22 |
5.70 |
||||
SH-1099/9 ODF |
|
1-1/8” |
|
|||||
SH-1078/9 ODF |
25.5 |
|
1-1/8” |
|
10 |
|||
SH-1079/11ODF |
|
1-3/8” |
35 |
PRODUCT APPLICATION
Used in refrigeration system.
v Pay by T/T, LC
v Customers can choose which payment ways that you accept, paypal is most useful and safe, please don’t refuse
paypal fee when you choose it.
v Loading Port: ShangHai or NingBo, China
v Samples are available within 7-10 working days.
v Mass Production Delivery: 20 -50days after sample confirmation