Brand Name: ZOZEN Boiler
Model Number: DZL
Place of Origin: Jiangsu,China
DZL series package boilers are horizontal three-pass water & fire tube boilers with a chain grate stoker structure. Threaded pyrotechnic tubes are arranged in the drum to form a convection heating surface, while the drum and the water walls on both sides form a radiation heating surface in the furnace. Each package system is fully installed and wired before being transported to site and is electrically controlled to provide functions such as stepless speed regulation for the stoker, threshold parameter alert and interlock protection.
DZL series steam boilers in the factory finished production, the whole factory, shipped to the site as long as the installation of valves, pipes, drums, induced draft fans, flue and water and electricity can be run. DZL series boiler main components are assembled into two big factory in our factory, the upper large (boiler) and lower (chain grate) big, two big needed after closed lower on the site before and after the furnace wall and masonry arch, smoke duct, piping, instruments and valves, slag machine, such as installation, and then turn on the water, electricity can be put into operation.
Advantages:
Compact structure, small volume;
Convenient installation, cheap in fundamental construction;
Mechanized coal feeding and cinder removing;
Sufficient output and high efficiency
Product thermal capacity: 2 – 20t/h
Working pressure: 1.0-2.5 MPA(10 bar to 25bar)
Outlet temperature: 170-225℃
Available fuel: Bituminous coal,lean coal,anthracite
Available industries: Heating, chemical, food, tobacco, textile, printing and dyeing, feed, medicine, building material, wine, rubber, hospital
Model |
Rated evaporation |
Rated working pressure(MPa) |
Rated steam temperature |
Thermal efficiency(%) |
DZL1-0.7-AⅡ |
1 |
0.7 |
170 |
79 |
DZL1-1.0-AⅡ |
1 |
1.0 |
184 |
79 |
DZL2-1.0-AⅡ |
2 |
1.0 |
184 |
79 |
DZL2-1.25-AⅡ |
2 |
1.25 |
194 |
79 |
DZL2-1.57-AⅡ |
2 |
1.57 |
204 |
79 |
DZL2-2.45-AⅡ |
2 |
2.45 |
225 |
79 |
DZL4-1.25-AⅡ |
4 |
1.25 |
194 |
79 |
DZL4-1.57-AⅡ |
4 |
1.57 |
204 |
79 |
DZL4-2.45-AⅡ |
4 |
2.45 |
225 |
79 |
DZL6-1.25-AⅡ |
6 |
1.25 |
194 |
79 |
DZL6-1.60-AⅡ |
6 |
1.6 |
205 |
79 |
DZL10-1.25-All |
10 |
1.25 |
194 |
79 |
DZL10-1.60-All |
10 |
1.6 |
205 |
79 |
DZL15-1.25-All |
15 |
1.25 |
194 |
79 |
DZL15-1.60-All |
15 |
1.6 |
205 |
79 |
DZL20-1.25-All |
20 |
1.25 |
194 |
79 |
DZL20-1.60-All |
20 |
1.6 |
205 |
79 |
1. How can you get the best price quickly?
(1) We need to know the boiler capacity, the fuel you plan to use and the steam pressure you need, and then we can confirm the boiler model.
(2) Customer needs to provide us your name, email address and company name, and then we will send you price list immediately.And if you use whatsapp, skype or wechat, you can provide us your ID, it will be more convenient for our communication.
2. Why should you believe our boiler quality?
(1).Strength calculation report with applied materials information;
(2).100%NDT(non-destructive inspection) report of steel plate, tube and welding rod;
(3).100% X-ray inspection( (Longitudinal, transversal safety inspection)): ensure the quality of entire boiler;
(4).Hydrostatic test: ensure the standard working pressure and safety;
(5).Third-party inspection report:By Jiangsu Boiler Inspection Institute;
(6).Passed ISO:9001 ,ISO14001,OHASA18001 and ASME(S and U) and A-class boiler certificate.
3. Quality warrantee
The seller guarantee quality of the machines for a period of 12 months from the date of trial run finish, but not to exceed 18 months from date on which the goods leave factory. If any parts (excluding easily damaging parts) are found defective in quality in the first year, the seller should replace free-of-cost.
4.Terms of payment
T/T 30% of total contract value as down payment;
T/T or L/C 70% of total contract value before delivery.
5.Claim
Any claims by the buyers regarding the machines shipped should be filed within 30 days after arrival of machines at the destination specified in the relative B/L and supported by a survey report issued by a surveyor approved by the sellers, otherwise the sellers shall refuse to consider. Claims in respect of matters within responsibility of insurance company and/or shipping company will not be considered by the seller.
6. What is the using life of your boiler?
A:Normally the boiler is designed for 20 years life span, but with right operation and good maintenance,the boiler can be used for 20-25 years.