Brand Name: Newex or OEM
Model Number: WA
Place of Origin: Guangdong, China (Mainland)
High Quantity Horizontal Heating Cooling Units Diffusion Trane Fan Coil Units With Competitive Price
Horizontal Concealed Fan Coil Unit for Chilled Water System:
1) CE certified
2) 2,3,4 rows coil (2 pipes) available
3) 4 rows 4 pipes available
4) Electric heater is for option
5) Factory mounted valve kits is for option
6) EC motor is for option
7) 50Hz motor is standard, 60Hz motor is for option
8) 220V/240V motor optional
9) Thermostat controller is for option
10) With or without plenum and filter
11) Coil with air vent
12) Blue fin coil is for standard
13) extended SS drain pan available
Unit model and nameplate description:
FEATURES:
Ultra-Slim configuration - WAseries FCU is designed to be thin and light. It's fit for the ceiling space limited occasion.
Motor - High precision bearing, high efficiency, dependability,long running life. Dispense with lubricant,and it can save much of the maintenance charge.
The quietly centrifugal blower - Equiped with one or more 160mmdiameter high effection centrifugal blowers unit. Advantage in enough air supply, low noise level, equiality flow, high efficiency.
Junction box
Connection - Our standard connector is female-thread pipes,please contact with us before ordering if require other connection. We have left and right connected models for choose.
Top panel - The top panel can isolation the enternal interior air and of outside, improve the IAQ.
Panel - High strength galvanized steel, galvanized skin >28 μm thick.
Standard mixing box (optional) - The standard unit is not including the mixing box except required at first. And we can supply the the mixing box as optional accessory.
Filter (optional) - Set on the return air inlet, nylon net pre-filter.
High efficiency coil - with special design, the coil can advance the heat exchange efficiency, and reduce the running cost. The coil is with large area and the air flow is with low velocity.
Drain pan - Drain pan is extruded by the high strength steel.Protected by powder coating paint. Under the drain pan, it is covered with PEF insulation(B1 stage) to pevent any occurrence of condenstation.
It can be took down and cleaned.
Testing - Our products have been check in the integrateion test center. Each unit have finished with the pressure test, electric test and achieve the national standard.
OUR FACTORY |
Packing: standard carton packing, use wooden packing based on the actual situation.
Delivery time: shipped in 15~25 working days after payment.
A: We are factory.
A: Generally it is 5-10 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to quantity.
A: Yes, we could offer the sample for free charge but do not pay the cost of freight.
A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.
High Quantity Horizontal Heating Cooling Units Diffusion Trane Fan Coil Units With Competitive Price