Brand Name: Ujing
Model Number: OL70-585E
Place of Origin: Zhejiang, China (Mainland)
Model NO. |
OL70-585E |
Power Supply | AC120V/60Hz |
Power Consumption | 820W |
Rated Current | 3.8A |
Dehumidify Capacity(℃) | 140 Pints / Day (86°F ,80%RH) |
Full Water Quantity | 8L |
Noise | ≤48dB(A) |
Air Circulation | 450m3/hr |
Refrigerant /Charge | R410a/420g |
Working Temp. | 41°F -100 °F |
Recommend Room Size | 640-910square foot(height=2.6m) |
Control Type | Electrical |
Status Indicator | Yes |
Timer | 0-24hours |
Auto Defrost | Yes |
Body Size(mm) | 460*302*710mm |
Package Size | 526*366*765mm |
Net Weight | 27kg |
Gross Weight | 29.5kg |
Feature and Function
1.Function Priciple:Refrigerant drying
2.Compressor:Rolliing piston compressor
3.Automatic defrosting mode:Electirc
4.Protected control panel
5.Automatic dehumidification mode:Hygrostat-controlled
6.Warming lamp to indicate that the water tank is full
7.Air filter easy to remove ,easy to clean
8.Type of housing:Synthetic Material
9.Mobility:Plastic castors
10.Interated outlet to allow the condensate to drain off when not supervised in continuous mode
11.Selectable Ionizer
Packing &Shipping
Packing material : export special material
Packing size:526*366*765mm
20' can hold 210 sets
40' can hold 420 sets
40'HQ can hold 420 sets
Our Service
Company Information
Test Room
FAQ
Q: Are you a trading company or manufacture?
A: As one of the oldest manufactures of dehumidifiers and humidifiers,we are now taking the leading position of air treatment industry in mainland China. We have more than 300 employees with more than 25 engineers and 4 production lines.
Q: Do you accept OEM?
A: Yes, we can accept OEM, and we have the professional designer to help you design your logo.
Q: Can I buy a sample for testing
A: Yes, we can supply you with a sample. for most of the
models,we have them in stock. we can supply you with the
sample within 7 days after we get your payment.
Q: Can I visit your factory?
A: We warmly welcome you come to visit us at Hangzhou city, Zhejiang province. You can take the airplane to Shanghai, then take the fast train for 50 minute to Hangzhou railway station,
we can pick you up at the railway station. If you fly to Hangzhou directly, we can pick you up at the airport.
Q: Which certification this model have?
A: CCC,CE
Q: What is the delivery time for bulk machine?
A:40days for first delivery,second is 30days